Preface: 61-69 developed blog themes, text, material, links and changes.
This task: Check whether the blog covers the full procurement task and is ready for technical acceptance.
Objective and readiness

After a group of blogs is completed, the subject is not judged in terms of the number of pages and words. The initial keyword repository, client questions, and the group's articles are listed in parallel, examining the barriers to the reader's initial understanding and preparation of communication. The subject's integrity means that key tasks are answered or gaps are clearly documented, without requiring that all the knowledge of the industry be posted on the website or that more articles be ranked.
Creates a thematic receipt and inspection page, which includes subject numbers, major procurement tasks, covered articles, state of evidence, entry pages and missing answers. Checks are made by question and then by URL: whether a question has been answered in its entirety and whether an article has been duplicated. There are many but the same answers should be consolidated, and what is necessary and insufficient for the task is left to be prepared and not pretended to have been completed.
Method of operation
The text check allows cross-reading. A hypothetical need for a person who is not involved in writing to indicate what to start with, what to see and where to go next. If you have to read multiple repetitions before you find an answer, the structure needs to be adjusted.
The material examines the source permissions, drawings, data calibres and text relationships, and links check the coverage of the target validity and linguistic consistency. Each question records the responsible person and the state of repair, and cannot mark the whole group by one mark. Technical failures are treated separately from content gaps, and the subsequent technology SEO phase knows whether a state code needs to be repaired, retrofitting or continuing to write the answers.
Apply examples
If there is still a lack of clear documentation of the sample opinion, the subject matter is still missing, even if three long articles already exist. Supplements can be done in existing sample articles without having to create a separate URL for each gap.
The subject of hotel uniforms procurement should be able to enter the corresponding clothing range and custom process, and the proposals in the article should be in line with the plant's recognized capabilities. A cross-cutting article that does not deal with the plant's products does not count as thematic coverage.
Outputs and acceptances
The table of plans after the output is accepted is ready, ready for repair or information for each item, and maintains the basis. The preparation of the item requires an author, review of the record, URL, material and links, and a defined template, which is still subject to follow-up technology and up-line acceptance and cannot be considered to be publicly available.
At the end of this phase, a list of content and pages is frozen as a technical check, and subsequent changes continue to be recorded. The blog system has answered the procurement questions and then confirms whether the search system and the real client can access them.




